Map of Palouse Groundwater Basin Boundary with project elements in Moscow and Pullman areas. Gray background with black and teal lines representing roadways and waterways, with a dark teal border representing the basin boundary. Project elements include images of water piped from waterway into a building, then into a water treatment plant, then into a house; a pumped storage energy option.

Leave a Comment